Project Profile
The construction site of this project is located in Yihe Town, Suide County, Yulin City, Shaanxi Province. The total scale of natural gas treatment is designed to be 14×108m3/a, and 10×108m3/a treatment capacity is reserved. The natural gas treatment plant adopts first pressurization and then de-oil and dehydration process.
cut-off and pipe-cleaning area, gas collection and distribution and fuel gas area, de-oiling and de-watering device area (including de-oiling and de-watering system, condensate stabilization system, etc.), pressurization device area, venting and liquid separation area, flare area, storage and transportation facilities and produced water pretreatment, produced water treatment and reinjection area, fire-fighting system, air-nitrogen station, and so on.
Scope of Work
Suide natural gas treatment plant
1 set of safety instrumented system (SIS).
1 set of gas detection system (GDS).
1 set of SCADA system for operation area.
Expansion and configuration of database of SCADA system of the Second Gas Production Plant.。
DCS system
SIS system
GDS system
SCADA system